Project History
ACH – working in the Alberta Children’s Hospital constantly from 2011 to present
WIFI Infrastructure Upgrade – Upgrade to existing WIFI and addition of new wireless access ports for the full facility, Rotary Flames House & CDC building
3T MRI, CT & Fluoroscopy Installations – Remove, replace and upgrade existing installations for new DI equipment
Kidsim Simulation Centre – Installation of training OR’s for AHS staff and students
Connect Care WIFI & Non-Medical Devices – Addition of wireless access ports and infrastructure for upgrades for provincial connect care initiatives
Good Earth Renovation – update and improve existing good earth coffee house
Mental Health In Patient Room Repairs – Upgrade to existing pediatric mental health rooms
Facilities Maintenance & Engineering – Working directly with the maintenance to install additional power, communications, security and lighting
FMC – maintained and crew within the Foothills Medical Centre since 1997 to present
Fire Code Upgrades – remove, replace and update the fire alarm systems within the Main Building, Special Service Building, North/South Tower and Tom Baker Cancer Centre
LINAC Vault Replacements – Upgrade all the existing radiation vaults in the TBCC with new targeted radiation machine for cancer patients
Cath Lab Renovations – Removed and replaced all existing cardiac CT X-Rays with new
UPS Upgrade – install new UPS Battery banks in the Main Building, SSB & McCaig Tower c/w UPS branch circuit panel through the entire facility
15KV Switchgear Replacement – Remove & replace existing 15KV switchgear in the active facility with minimal shutdown and disruptions
Allied Burn Unit – Upgrades and renovation to entire burn unit
Nurse Call Upgrades – upgrade and existing nurse call systems
MRI, CT, Angiography & Fluoroscopy Installations – Remove, replace and upgrade existing installations for new DI equipment
Facilities Maintenance & Engineering – Working directly with the maintenance to install additional power, communications, security and lighting
RGH – working in the Rockyview General Hospital constantly from 2008 to present
Connect Care WIFI & Non-Medical Devices – Addition of wireless access ports and infrastructure for upgrades for provincial connect care initiatives
ICU, CCU & GI – addition of new Intensive Care Unit, Critical Care Unit and Gastrointestinal Unit
Chiller Replacement – Replace and addition of new chiller in existing facility
MRI, CT, Angiography & Fluoroscopy Installations – Remove, replace and upgrade existing installations for new DI equipment
Unit 47, 48, 57, 58 & 59 Med Room Upgrades – replaced existing med rooms
PLC – working in the Peter Lougheed Centre constantly from 2013 to present
Pandemic Facility – Emergency installation of a 68-bed unit over a 3-week period (design to completion) during the 2020 pandemic (as per the attached video)
Nurse Call Upgrades – upgrade and existing nurse call systems
CT, Angiography & Fluoroscopy Installations – Remove, replace and upgrade existing installations for new DI equipment
Fan wall Upgrade – Remove and replace existing facility Air Handling Units with new fan walls
Facilities Maintenance & Engineering – Working directly with the maintenance to install additional power, communications, security and lighting
South Health Campus
Field Hospital - Emergency installation of a 90-bed unit & 97-bed unit over a 3-month period (design to completion) during the 2020 pandemic
Facilities Maintenance & Engineering – Working directly with the maintenance to install additional power, communications, security and lighting