ACH – working in the Alberta Children’s Hospital constantly from 2011 to present

  • WIFI Infrastructure Upgrade – Upgrade to existing WIFI and addition of new wireless access ports for the full facility, Rotary Flames House & CDC building

  • 3T MRI, CT & Fluoroscopy Installations – Remove, replace and upgrade existing installations for new DI equipment

  • Kidsim Simulation Centre – Installation of training OR’s for AHS staff and students

  • Connect Care WIFI & Non-Medical Devices – Addition of wireless access ports and infrastructure for upgrades for provincial connect care initiatives

  • Good Earth Renovation – update and improve existing good earth coffee house

  • Mental Health In Patient Room Repairs – Upgrade to existing pediatric mental health rooms

  • Facilities Maintenance & Engineering – Working directly with the maintenance to install additional power, communications, security and lighting


FMC – maintained and crew within the Foothills Medical Centre since 1997 to present

  • Fire Code Upgrades – remove, replace and update the fire alarm systems within the Main Building, Special Service Building, North/South Tower and Tom Baker Cancer Centre

  • LINAC Vault Replacements – Upgrade all the existing radiation vaults in the TBCC with new targeted radiation machine for cancer patients

  • Cath Lab Renovations – Removed and replaced all existing cardiac CT X-Rays with new

  • UPS Upgrade – install new UPS Battery banks in the Main Building, SSB & McCaig Tower c/w UPS branch circuit panel through the entire facility

  • 15KV Switchgear Replacement – Remove & replace existing 15KV switchgear in the active facility with minimal shutdown and disruptions

  • Allied Burn Unit – Upgrades and renovation to entire burn unit

  • Nurse Call Upgrades – upgrade and existing nurse call systems

  • MRI, CT, Angiography & Fluoroscopy Installations – Remove, replace and upgrade existing installations for new DI equipment

  • Facilities Maintenance & Engineering – Working directly with the maintenance to install additional power, communications, security and lighting


RGH – working in the Rockyview General Hospital constantly from 2008 to present

  • Connect Care WIFI & Non-Medical Devices – Addition of wireless access ports and infrastructure for upgrades for provincial connect care initiatives

  • ICU, CCU & GI – addition of new Intensive Care Unit, Critical Care Unit and Gastrointestinal Unit

  • Chiller Replacement – Replace and addition of new chiller in existing facility

  • MRI, CT, Angiography & Fluoroscopy Installations – Remove, replace and upgrade existing installations for new DI equipment

  • Unit 47, 48, 57, 58 & 59 Med Room Upgrades – replaced existing med rooms


PLC – working in the Peter Lougheed Centre constantly from 2013 to present

  • Pandemic Facility – Emergency installation of a 68-bed unit over a 3-week period (design to completion) during the 2020 pandemic (as per the attached video)

  • Nurse Call Upgrades – upgrade and existing nurse call systems

  • CT, Angiography & Fluoroscopy Installations – Remove, replace and upgrade existing installations for new DI equipment

  • Fan wall Upgrade – Remove and replace existing facility Air Handling Units with new fan walls

  • Facilities Maintenance & Engineering – Working directly with the maintenance to install additional power, communications, security and lighting


South Health Campus

  • Field Hospital - Emergency installation of a 90-bed unit & 97-bed unit over a 3-month period (design to completion) during the 2020 pandemic

  • Facilities Maintenance & Engineering – Working directly with the maintenance to install additional power, communications, security and lighting